In the spring of 2016, Burbank School District 111 passed a referendum to fund the replacement of their existing K-6 facility, Luther Burbank School. Upon passage of the referendum, the District immediately commenced their search for an architect and construction manager. ICI was chosen from among sixteen construction management firms through a competitive selection process based on our scheduling expertise and portfolio of similar work.
ICI partnered with the District and the architect throughout the design and preconstruction phase providing detailed cost estimates, project phasing and scheduling, long lead item procurement and site logistics planning.
The new 80,000 square foot school was constructed on the same parcel; adjacent to the existing, occupied school. The first floor houses 12 classrooms, 3 shared learning spaces, 3 pull out spaces, a cafeteria and adjacent kitchen, a gymnasium and multiple ancillary spaces. The second floor contains 9 classrooms, 3 shared learning spaces, 3 pull out spaces, a library, art and music rooms, a maker space, special education areas as well as storage and a teacher lounge.
The school incorporates many eco-friendly elements including geo-thermal energy, an expansive rain garden and sunshades.
View Project PdfLet's Connect
-
Ready to talk about your next project?Contact Us